How to set a letterbox post (2024)

Read the installation instructions provided by the letterbox manufacturer and then follow these simple steps to use the recommended concrete product to install your new letterbox.

Tools you will need:

  • Spirit level
  • Tape measure
  • Post hole digger or long handled shovel
  • Measuring jug
  • Hose or bucket
  • Rod for tamping

Materials you will need:

  • Bags of Rapid Set Concrete 20kg
  • Letterbox& post
  • Drainage material: gravel
  • Clean water

Recommended products

Although you can use any product from the Cement Australia concrete range, we recommend Rapid Set Concrete for ease & speed.

How to set a letterbox post (1)

Rapid Set Concrete

Specially formulated to harden rapidly, so you can complete a job faster

Before you get started

  • Use the Calculator to estimate how many 20kg bags you will need
  • Read the FAQs section
  • Rapid Set Concrete will harden in 15 minutes or even faster on a hot day. Be prepared to complete your project quickly. Take the time to read these instructions carefully before getting started.
  • Ensure you have any relevant approvals or permitsEnsure there are no pipes or services below the ground; contact Dial Before You Dig on 1100or via their website www.1100.com.au for advice on the locations of submerged pipes and cables.

How to set a letterbox post (2)

Safety

Before you begin any project, please ensure you protect yourself with the following:

How to set a letterbox post (3)

Boots

How to set a letterbox post (4)

Face mask

How to set a letterbox post (5)

Gloves

How to set a letterbox post (6)

Googles

How to set a letterbox post (7)

Long pants & sleeves

How to set a letterbox post (8)

Team lift

Look after yourself properly

  • Protect your skin and eyes. Cement based products are alkaline and can cause burns to exposed skin or eyes.
  • When working outdoors, be SunSmart - Slip on some sun-protective clothing – Slop on sunscreen - Slap on a hat - Seek shade - Slide on some sunglasses.
  • All 20kg bags of cement products require 2 people to lift them safely. Always follow safe lifting procedures to avoid injury. So you will need afriend to help you handle the 20kg bags and to assist with holding the letterbox post whilst you add the Rapid Set Concrete.

HOW TO SET A POST IN THE GROUND TO HOLD A LETTERBOX

How to set a letterbox post (9)

1

DIG THE HOLE

Replacing an existing letterbox? Dig out the current letterbox post and dispose of correctly.

If you’re putting your letterbox in a new location, use a post hole digger or long handled shovel to dig your post hole adding 10cm depth to allow for gravel to be placed under the post for drainage. Aim for the letterbox opening to be between 900 mm and 1200 mm above the ground.

Tip

Refer to our simpleCalculatorto work out how much concrete product you will need.

How to set a letterbox post (10)

2

SOAK THE HOLE

Pre-soak the hole thoroughly with clean water and allow the water to drain into the soil.

How to set a letterbox post (11)

3

POSITION THE LETTERBOX POST

Place 10cm of gravel in the hole for drainage. Position your letterbox post in the centre of the hole, ensuring that it is vertical using a spirit level. Ask your friend to hold the letterbox post steady in position.

How to set a letterbox post (12)

4

ADD WATER & HALF THE RAPID SET CONCRETE

Accurately measure 2.5 litres of clean water per 20kg bag and add the water to the hole. Immediately pour in half the bag of Rapid Set Concrete making sure that it is evenly distributed around the post.

Play

Guide to setting a post using Rapid Set

How to set a letterbox post (13)

How to set a letterbox post (14)

5

TAMP WELL & ADD THE REST

Tamp the product around the post using a rod to remove any air pockets. Add the remaining half bag of product and tamp again. Add small amounts of water only if required to ensure that the mix is completely moistened. Should you need more concrete for the hole, immediately repeat the process with another bag.

Tip

Tamping is essential to remove air pockets and achieves a solidly set letterbox every time.

How to set a letterbox post (15)

6

SLOPE THE SURFACE

Heap the surface of the concrete to create a rounded crown around the letterbox post so any surface water flows away from the post. Cover the concrete surface with earth or a decorative gravel for a tidy finish.

How to set a letterbox post (16)

7

ATTACH THE LETTERBOX

Wait for 24 hours for the concrete to harden before attaching the letterbox to the post.

Hints & tips

  • If the post is made of aluminium or steel, make sure that it has been properly sealed before setting it into the ground using any concrete product. Concrete contains cement which is an alkaline substance and can cause corrosion to uncoated metals.

How much product do I need?

Calculator

Where can I buy this?

Find a stockist

Top

How to set a letterbox post (2024)
Top Articles
Destiny 2: Best PvP Hunter Builds for Each Class
The 23 Best Chinese Restaurants for Takeout in Cleveland, According to Yelp
Chs.mywork
Hotels Near 625 Smith Avenue Nashville Tn 37203
Main Moon Ilion Menu
Www.fresno.courts.ca.gov
Tabc On The Fly Final Exam Answers
Federal Fusion 308 165 Grain Ballistics Chart
Wmu Course Offerings
Ashlyn Peaks Bio
Lowes 385
Displays settings on Mac
AB Solutions Portal | Login
Ecers-3 Cheat Sheet Free
Caresha Please Discount Code
Studentvue Columbia Heights
Alexander Funeral Home Gallatin Obituaries
Xomissmandi
How Much You Should Be Tipping For Beauty Services - American Beauty Institute
Milspec Mojo Bio
Candy Land Santa Ana
Delaware Skip The Games
12 Top-Rated Things to Do in Muskegon, MI
Craigslist Org Appleton Wi
Hannaford To-Go: Grocery Curbside Pickup
Minnick Funeral Home West Point Nebraska
Slim Thug’s Wealth and Wellness: A Journey Beyond Music
Naya Padkar Gujarati News Paper
Deshuesadero El Pulpo
Suspiciouswetspot
Phoenixdabarbie
Yayo - RimWorld Wiki
Filmy Met
Mp4Mania.net1
Rogers Centre is getting a $300M reno. Here's what the Blue Jays ballpark will look like | CBC News
Plead Irksomely Crossword
Felix Mallard Lpsg
The Closest Walmart From My Location
Lovely Nails Prices (2024) – Salon Rates
10 Rarest and Most Valuable Milk Glass Pieces: Value Guide
Go Bananas Wareham Ma
Isabella Duan Ahn Stanford
Ethan Cutkosky co*ck
Hkx File Compatibility Check Skyrim/Sse
Craigslist Rooms For Rent In San Fernando Valley
Mynord
Yourcuteelena
How the Color Pink Influences Mood and Emotions: A Psychological Perspective
Lesly Center Tiraj Rapid
Leland Westerlund
Underground Weather Tropical
Latest Posts
Article information

Author: Aracelis Kilback

Last Updated:

Views: 6058

Rating: 4.3 / 5 (64 voted)

Reviews: 87% of readers found this page helpful

Author information

Name: Aracelis Kilback

Birthday: 1994-11-22

Address: Apt. 895 30151 Green Plain, Lake Mariela, RI 98141

Phone: +5992291857476

Job: Legal Officer

Hobby: LARPing, role-playing games, Slacklining, Reading, Inline skating, Brazilian jiu-jitsu, Dance

Introduction: My name is Aracelis Kilback, I am a nice, gentle, agreeable, joyous, attractive, combative, gifted person who loves writing and wants to share my knowledge and understanding with you.